Formula and worked example
Base nominal rebar weight = total developed bar length × tabulated weight per unit length. In piece mode, total length = number of pieces × developed length per piece. Planning weight = base weight × (1 + allowance percentage ÷ 100). The allowance is optional and starts at zero.
Example: 10 pieces of US #5 bar, each 20 ft long, have 200 ft combined length. At the tabulated nominal 1.043 lb/ft, the base weight is 208.6 lb, or 94.619 kg. With zero allowance, planning weight is unchanged. A user-selected 10% allowance adds 20 ft and 20.86 lb, for 220 ft and 229.46 lb. The tool does not convert that allowance into a whole stock-bar order.
Choose the US bar designation
Select the actual US nominal bar size from your drawings or material specification. The available sizes are #3 through #11, plus #14 and #18. The calculator uses the imperial table’s nominal lb/ft values directly. It does not estimate mass from an assumed steel density or from measured outside ribs.
The selector also shows the tabulated nominal diameter. Larger designations do not follow a universal number-divided-by-eight diameter rule: for example, the nominal diameter of #9 is 1.128 in. Length entered in meters remains a US-designated bar; a metric input does not silently substitute a different national bar-size system.
Developed length and separate groups
Enter length measured along the bar, including any hooks, bends, laps or other details already specified in the takeoff. This calculator does not derive those lengths from member dimensions. A straight span alone may omit required developed length.
Piece mode assumes every entered piece has the same size and developed length. Use known-total mode when a verified takeoff already gives combined length for one bar size. For different sizes or cut lengths, calculate each group and add the base masses. Apply a planning allowance only once to the intended quantities.
Metric example
For 100 m of US #4 bar, the nominal table weight is 0.668 lb/ft. The calculated mass is approximately 99.409 kg, or 219.16 lb. This uses the US table value and exact unit conversions, so its kg/m value may differ slightly from separately rounded metric reference tables.
The base example of 200 ft is exactly 60.96 m. Converting the length input to meters should preserve its nominal weight. A US short ton means 2,000 lb; a metric tonne means 1,000 kg. The output labels distinguish them.
Nominal weight versus delivered weight
Nominal weights are rounded reference values. Actual product weight can vary; confirm the supplied material and shipment mass with the supplier. Coatings, couplers, tie wire and accessories are not added here. Stainless steel, FRP, wire products and other materials need their own unit-mass data.
An allowance is an explicit planning addition, not a manufacturing tolerance, minimum strength check or automatic stock-bar quantity. No bar-count rounding, stock-length cutting optimization or package count is performed. Spacing, lap design, bending schedules, structural capacity and reinforcement selection require separate calculations and specifications.
Units, precision and limits
Length inputs support feet, inches, yards, meters, centimeters and millimeters. Unit selectors convert valid measurements; changing length method preserves its own stored inputs and clears the old result until recalculation. Calculations use unrounded numeric values before displaying up to three decimals.
One international foot equals 0.3048 m and one pound equals 0.45359237 kg. Converted kg/m = tabulated lb/ft × 0.45359237 ÷ 0.3048. Very small positive outputs use scientific notation. Positive active lengths must be at least 0.000001 ft. Combined and allowance-adjusted lengths cannot exceed 1 billion ft. Piece count must be an integer from 1 to 1,000,000; allowance accepts 0–100%. These are data-entry bounds, not reinforcement recommendations.
Reference
Re-Steel Supply Company conversion table supplies the US imperial nominal bar diameters and lb/ft weights used by this page. Civilable converts those weights for metric output and keeps the US designations. Confirm project material and purchasing information with the supplier.