Formula and worked example
Gross concrete envelope per hole = hole cross-sectional area × concrete fill height. Post displacement = actual post cross-sectional area × post length within concrete. Net concrete per hole = gross envelope − post displacement. Multiply by identical hole count, then apply the chosen ordering allowance once.
For round sections, area = π × diameter² ÷ 4. For rectangular sections, area = width × length or thickness. All dimensions are converted to matching units before calculation.
Illustrative example: a 10 in diameter hole with 24 in concrete fill height encloses approximately 1.0908307825 ft³. A 3.5 in × 3.5 in actual rectangular post overlapping all 24 in displaces 0.1701388889 ft³. Net concrete is about 0.9206918936 ft³ per hole. Ten identical holes with an editable 10% allowance require 10.1276108297 ft³, or 0.3750966974 yd³.
At the editable example yield of 0.60 ft³ per bag, pooled volume needs 17 whole bags. Each hole separately needs 2 whole bags, giving 20 bags if all ten holes are rounded independently. Pooled purchased coverage is 10.2 ft³, with approximately 0.0723891703 ft³ beyond the allowance-adjusted requirement. These dimensions are arithmetic examples, not approved footing details.
Concrete fill height is not excavation depth
Enter the height of concrete only. Gravel bedding, soil backfill and unfilled space above the concrete do not count as concrete. If a hole has those layers, subtract them when determining the concrete fill height before entering it. Do not deduct the same layer twice.
The post length within concrete is the actual overlap between the post and that concrete envelope. It can be less than fill height if there is a concrete pad below the post. It cannot exceed the fill height. Concrete collars or caps outside the entered straight envelope need a separate volume takeoff.
Actual post size and fit
Use actual outside post dimensions, not nominal lumber names. The post is assumed centered. For a rectangular post in a round hole, its full diagonal must be smaller than hole diameter, not merely its width. In rectangular holes, post width and thickness align with the corresponding hole axes. A round post must fit within both rectangular axes.
The post section is treated as solid or as an enclosed void into which concrete cannot enter. An open hollow post that fills internally with concrete needs a separate displacement calculation. Tapered, belled, irregular or angled sections also need a different takeoff.
Fit validation only checks the entered geometry. It does not establish concrete cover, required embedment, frost depth, bearing, wind resistance or structural adequacy. Obtain hole and post details from the project design before estimating quantities.
Exact rectangular and metric references
A 12 in × 12 in rectangular hole with 24 in fill height has 2 ft³ gross envelope. A 6 in × 6 in post overlapping 24 in displaces 0.5 ft³, leaving 1.5 ft³ per hole. Four holes with zero allowance need exactly 6 ft³. At 0.60 ft³ per bag, pooled volume needs exactly 10 bags; independently rounding each hole gives 3 per hole and 12 bags total.
Metric arithmetic example: a 0.30 m × 0.30 m rectangular hole with 0.60 m fill height encloses 0.054 m³. A 0.10 m × 0.10 m post overlapping 0.50 m displaces 0.005 m³. Net is 0.049 m³ each. Two holes with zero allowance need 0.098 m³ or 98 L. At a user-entered 20 L per bag, pooled volume needs 5 bags; separately rounded holes need 3 each, or 6 total.
Bag rounding, allowance and product yield
Ordering allowance applies to unrounded net concrete volume before bag rounding. Pooled volume bags = round up(combined required volume ÷ finished yield per bag). Separately rounded bags = hole count × round up(required volume per hole ÷ finished yield per bag). The latter may be larger because each hole is rounded independently.
These are volume-based comparisons. They do not prescribe mixing, partial-bag handling or a post-setting installation method. Confirm the actual product’s finished yield and instructions. Cement-only bag weight and loose dry volume are not finished concrete yield. Different complete premixes and fast-setting post products can have different yields and methods.
Units, precision and limits
Dimensions accept feet, inches, yards, meters, centimeters and millimeters. Length selectors convert valid measurements. Bag yield accepts ft³, m³ or liters; its selector retains the numeric entry to match the source label. One cubic foot equals 0.028316846592 m³ and one cubic yard equals 27 ft³.
Rectangular geometry and decimal bag divisions use exact reduced fractions. Round geometry uses π approximated to 40 decimal places; measured geometry and labeled yields remain approximate. Whole-bag counts use the calculation values before display rounding to three decimals. Positive dimensions support 0.000001–1,000,000 ft after conversion. Hole count is an integer from 1 to 100,000; allowance accepts 0–100%. Total and allowance-adjusted concrete are limited to 1 billion ft³. Bag yield supports 0.000000001–1 m³ and estimates above 10 million bags are rejected as entry checks.
References
QUIKRETE Concrete Mix No. 1101 data sheet lists approximate finished yields, including 0.60 ft³ for its 80 lb bag. That yield is the form’s editable example; confirm the package being purchased.
QUIKRETE Setting Posts without Mixing distinguishes gravel bedding from concrete in a product-specific post-setting method. Civilable uses entered concrete fill height and does not import that method’s sizing or installation instructions into this quantity estimate.